Seaward Apollo 600 Betriebsanleitung

Stöbern Sie online oder laden Sie Betriebsanleitung nach Multimeter Seaward Apollo 600 herunter. Seaward Apollo 600 Operating instructions Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 32
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Apollo 600
Table of Contents
1. Limited Warranty & Limitation of Liability
2. Disposal of old product
3. Certificate of Conformity
4. User Notes
5. Safety Notes
6. Accessories
6.1 Standard accessories
6.2 Optional Accessories
7. Introduction to the Apollo 600
7.1 Front diagram
7.2 Top Diagram
7.3 Back diagram
8. Getting Started
8.1 Charging New Batteries
8.2 Power On
9. User Interface Navigation
9.1 Screen Layout
9.2 Menu Navigation
9.3 Battery Status
9.4 Test Functionality
10. Main Menu
10.1 View Saved Data
10.2 User Options
10.3 Bluetooth Setup
10.4 Automatic Test Sequence Editor (PAT Edit)
10.5 Download
10.5.1 Downloading into PATGuard 3
10.6 Upload
10.6.1 Uploading from PATGuard 3
10.6.2 Uploading a Logo for TnT Labels
10.7 Set Date and Time
10.8 Memory
11. Portable Appliance Testing
11.1 Automatic Test Sequence
11.1.1 Entering Asset Details
11.1.2 Using the Risk Based Retest Period Calculator
11.1.3 The Formal Visual Inspection
11.2 Manual Test Interface
11.3 Test Functions
Earth Continuity
Nulling out Test Leads
Insulation Resistance
Seitenansicht 0
1 2 3 4 5 6 ... 31 32

Inhaltsverzeichnis

Seite 1 - Apollo 600

Apollo 600 Table of Contents 1. Limited Warranty & Limitation of Liability 2. Disposal of old product 3. Certificate of Conformity 4. User Not

Seite 2

10. Main Menu 10.1 View Saved Data This will allow you to view any data that you have saved in the Apollo 600. By selecting this icon in the Main M

Seite 3 - 2. Disposal of old product

This is the Delete User button. It will delete whichever user is currently selected in the ‘Username’ dropdown. Please note that the admin user canno

Seite 4

sequence. This is the Edit Test function. This will edit the highlighted test. 10.5 Download 10.5.1Downloading to PATGuard 3 You can download the

Seite 5 - 5. Safety Notes

10.7 Set Date and Time You can change the date and time in this menu using the arrow keys and number keys. Press this button to save changes and

Seite 6 - 6. Accessories

You can use the Camera function to attach photos to the asset record. This button will enable and disable the flash light. Press this button to

Seite 7 - 8. Getting Started

In PAT Settings set After Test to Print Label and press Save. See 10.3 Bluetooth Settings & 11.5 PAT Settings. This is the Tools function. This

Seite 8 - 9. User Interface Navigation

CLI EUT Continuity The test is performed between the red test terminal and the EUT test socket. Point to Point Continuity This test is performed b

Seite 9 - 9.4 Test Functionality

Nulling a single test lead In the manual PAT screen, press the setup key (F3) and change the Test Type to EUT Continuity Test. Press save (F4). Connec

Seite 10 - 10. Main Menu

Point to Point Insulation The test is performed between the Red and Black test terminals, both the continuity test leads are required for this test.

Seite 11 - 10.3 Bluetooth Setup

CLII Substitute Leakage The test is performed between the EUT socket live and neutral and Red test terminal. During this test, 40V A.C. is applied

Seite 12 - 10.6 Upload

Substitute Leakage Protective Earth (PE) Conductor Current Touch Current RCD Trip Time IEC Lead / Polarity External Leakage Adaptors 11.4 Checkbox Ver

Seite 13 - 10.7 Set Date and Time

Touch Current Warning: Always test the insulation resistance before performing a Touch Current test. Warning: Always check that an appliance with

Seite 14

IEC Lead / Polarity The IEC lead input is a test socket and is not intended to be connected directly to mains. Do not connect this input to the mains

Seite 15 - 11.3 Test Functions

Press this button to go to the previous page. Press this button to save changes and return to the previous screen. Asset ID This can be set to pr

Seite 16

Comments Can be set to open the comment window: always (after every test sequence), if the test result is a pass, if the test result is a fail or ne

Seite 17 - Insulation Resistance

Press this button to save changes and return to the previous screen. 13. Health & Safety Reports This menu allows you to complete and save Healt

Seite 18 - Substitute Leakage

15. Electrical Specification Earth Continuity Output Current (Load 2Ω): Test Voltage (o/c) : Measuring Range: Display

Seite 19

Load Power/Current Test Voltage: Display Range: Measurement Range: Resolution: Operating Error:

Seite 20 - Touch Current

16. Useful Information 16.1 Factory Set Test Sequences Test Visual Earth Continuity Insulation PE Conductor Current Touch Current Substitute Leaka

Seite 21 - 11.5 PAT Settings

Test Visual Earth Continuity Insulation PE Conductor Current Touch Current Substitute Leakage Wiring RCD Trip Time Name Duration (s) Limit (Ω) Dura

Seite 22

16.2 Other Information Parameter Default Min Max Earth Continuity P/F limit (Ω) 0.1 0.01 19.99 Earth Continuity Duration (s) 5 2 30 Insulation Re

Seite 23

1. Limited Warranty & Limitation of Liability SEAWARD Electronic Limited guarantees this product to be free from defects in material and workmansh

Seite 24 - 14. Updating your Firmware

17. Environmental Conditions The Apollo 600 has been designed to perform tests and measurements in a dry environment. Maximum barometric elevation for

Seite 25 - 15. Electrical Specification

Power off the instrument. Disconnect all test leads and accessories. Position the instrument face down and remove the screw holding the bat

Seite 26

19.2 Calibration Services:- www.calibrationhouse.co.uk Bracken Hill South West Industrial Estate Peterlee County Durham SR8 2SW Co Durham SR8 2SW E

Seite 27 - 16. Useful Information

3. Certificate of Conformity As the manufacturer of the apparatus listed, declare under our sole responsibility that the product: Apollo

Seite 28

4. User Notes These operating instructions are intended for the use of adequately trained personnel. The following symbols are used in thes

Seite 29 - 16.2 Other Information

The Apollo 600 includes a rechargeable battery pack which is charged while the Apollo 600 is connected to a mains supply. Only a Seaward battery pack

Seite 30 - 18. Maintenance

7. Introduction to the Apollo 600 Front 1. Test terminal end plate 2. LCD 3. Function keys 4. QWERTY keyboard 5. Test function STOP key 6. Test funct

Seite 31 - 19. Support

The first time the Apollo 600 is powered up the User will be automatically set to admin. The admin user gives full access to all the menus and functio

Seite 32

display the manual. This is the Menu/Options key. This function will bring up a context sensitive menu giving the options available for

Kommentare zu diesen Handbüchern

Keine Kommentare