Seaward PrimeTest 200 Betriebsanleitung

Stöbern Sie online oder laden Sie Betriebsanleitung nach Multimeter Seaward PrimeTest 200 herunter. Seaward PrimeTest 200 Operating instructions Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 20
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
PrimeTest 100 Operating Instructions
1
Operating Instructions
Bracken Hill
South West Industrial Estate
Peterlee
Co Durham
SR8 2SW
ENGLAND
Tel: +44(0)191 5863511
www.seaward.co.uk
sales@seaward.co.uk
service@seaward.co.uk
Part Number 344A550 Revision 1
© 2006 Seaward Electronic Ltd
Seitenansicht 0
1 2 3 4 5 6 ... 19 20

Inhaltsverzeichnis

Seite 1 - Operating Instructions

PrimeTest 100 Operating Instructions 1 Operating Instructions Bracken Hill South West Industrial Estate Pe

Seite 2

PrimeTest 100 Operating Instructions 10 If there is a fault with the Neutral connection this is indicated by the display below. In the event of a

Seite 3

PrimeTest 100 Operating Instructions 11 indicated as shown below. • The test sequence is halted. • If the measured value is less than

Seite 4

PrimeTest 100 Operating Instructions 12 • The unit will proceed with the Insulation and Leakage tests. Note: The power switch on the appliance

Seite 5

PrimeTest 100 Operating Instructions 13 3.3 Testing a Class II Appliance • Visually inspect the appliance and mains cord for signs of damage. •

Seite 6

PrimeTest 100 Operating Instructions 14 current is less than the factory set limit a tick is placed next to the ILEAK enunciator. • The PASS enunc

Seite 7

PrimeTest 100 Operating Instructions 15 to the Riso enunciator and the test sequence is halted. • If the Insulation Resistance is greater than t

Seite 8

PrimeTest 100 Operating Instructions 16 • Plug the supplied 0.5m red IEC lead into the IEC socket and into a mains outlet on the extension lead.

Seite 9

PrimeTest 100 Operating Instructions 17 4 Specification Earth Continuity Accuracy* ± (5% + 2 digits) Test current 200mA minimum Test voltage 9V n

Seite 10 - Operating Instructions

PrimeTest 100 Operating Instructions 18 Environmental rating IP Rating IP40 Operating temperature range 0°C to 40°C, without moisture condensation

Seite 11

PrimeTest 100 Operating Instructions 19 6.1 Battery Replacement Before opening the PrimeTest 100 ensure that all test leads are disconnected. •

Seite 12

PrimeTest 100 Operating Instructions 2 Limited Warranty & Limitation of Liability SEAWARD Electronic Limited guarantees this product to be fr

Seite 13

PrimeTest 100 Operating Instructions 20 7 Service and Calibration To maintain the specified accuracy of the measurement results, the instrument mu

Seite 14

PrimeTest 100 Operating Instructions 3 DECLARATION OF CONFORMITY As the manufacturer of the apparatus listed, declare under our sole responsibilit

Seite 15

PrimeTest 100 Operating Instructions 4 Contents 1 Important Information 5 2 Introduction 7 3 Performing Tests 9 3.1 Checking a mains power outl

Seite 16

PrimeTest 100 Operating Instructions 5 1 Important Information These operating instructions are intended for the use of adequately trained personn

Seite 17

PrimeTest 100 Operating Instructions 6 Figure 1. PrimeTest 100 Front View Figure 2. PrimeTest 100 End View

Seite 18

PrimeTest 100 Operating Instructions 7 2 Introduction The PrimeTest 100 is a hand held battery powered unit suitable for carrying out electrical sa

Seite 19

PrimeTest 100 Operating Instructions 8 Note: When a key is pressed to initiate a test sequence, the PrimeTest 100 will compare the type of applianc

Seite 20

PrimeTest 100 Operating Instructions 9 3 Performing Tests Press keys + to switch on the PrimeTest 100. When the unit is ready the display will

Kommentare zu diesen Handbüchern

Keine Kommentare